Timing is Everything: Meeting Demand for Critical Product Lines

CLIENT INDUSTRY: Aerospace and Defense Company

SOLUTION: Operational Excellence

The client is a designer, manufacturer, and integrator of very high-technology military product. The company lacked the capacity to meet its customers’ demands, resulting in extreme customer dissatisfaction that had progressed to threats of drastic measures, Because of contractual penalties, the company stood to lose money and orders if it could not meet promised delivery dates.

Business Challenge

The challenge was to assess the capabilities of the client’s distributed manufacturing environment and design and implement a lean production system to double production capacity in a relatively short time period.

Solution

  • CBS thoroughly studied the client’s production facilities and capabilities and recommended the most appropriate production system based on the volume and variation of the products.
  • The consultants determined the theoretical lead time of each product line and used that to establish strategic objectives for each area.
  • Process improvement personnel in each area of the client company were engaged fully to ensure that changes to the production system would be sustainable.
  • A team of CBS consultants and the client company’s assembly personnel:
    • Developed capacity tools for critical product lines and incorporated these tools into sales and operations processes.
    • Identified and eliminated non-value-added activities.
    • Implemented a takt-based system in a low-volume, high-mix environment that divided tasks into day buckets.
    • Trained operators and leadership in the new system.

Results

  • Doubled shop capacity in four months.
  • Reduced product lead time from 50 days to 13 days.
  • Increased productivity by 40%, resulting in a return of approximately $10 million over a two-year period.
  • The production line has sustained these improvements with little outside intervention.

Download the PDF

 

Latest Insights

When one of our clients recognized the extent to which rising inefficiencies were affecting their business processes, the client reached out to the CBS experts for help. In just a matter of months, the results speak for themselves: a significant bump in all relevant KPIs, with several areas improving as much as 93%.

After years of cost cutting and loss of experienced “Tribal” manufacturing knowledge, a CBS aerospace client was not able to support increasing customer demand. Though they continued to make promises to return to on-time delivery, they continued to run 9 months delinquent to customer demand. Based on our prompt assessment of the situation, CBS developed and implemented an improvement plan that brought the client back to on-time and full condition.

Sign up to receive our latest insights!

  • This field is for validation purposes and should be left unchanged.