CBS Consulting worked with a private equity client to greatly improve their operational performance for a recently acquired company. The company was previously family-owned and a quality leader in their industrial equipment market.

After our initial assessment, we targeted production costs, production lead time, and capacity/throughput. Additionally, the company lacked several basic business disciplines, like:

  • Material Resource Planning (MRP)
  • Sales, Inventory and Operations Planning (SIOP)
  • Engineering Change Management

The result was rampant materials shortages, high levels of overtime, and poor customer satisfaction (on-time delivery and quality). The organization had experienced several previous cycles of failed attempts to apply continuous improvement tools, like Lean/Toyota Production System (TPS). Workforce skepticism was high, and their Lean skill level and change readiness were low.

Business Challenge

Our goal was to double their current throughput with the resources on hand. This improvement would affect all three target areas.

  • Double capacity with no addition of people or equipment
  • Increase productivity 25%
  • Decrease lead times by 30%

Also, we worked to rapidly transfer knowledge to their leaders and employees to sutain these improvements.

Solution

  • Developed a detailed plan for phased implementation starting with an initial project with heavy CBS support to train internal resources and demonstrate results. All subsequent improvement efforts were co-led by internal employees and CBS consultants to accelerate cycles of learning and foster independence.
  • Addressed critical business processes – prioritizing and implementing as required:
    • Master scheduling
    • MRP
    • Product standardization
  • Implemented a mixed-model “One Piece” flow line. Implementation included:
    • Deploying Standard Work
    • Point-Of-Use (POI) materials
    • Kanban material replenishment systems
  • Identified and implemented jigs, fixtures, new methods to increase productivity and reduce waste
  • Implemented Shop Floor Management, Lean metrics, Leader Standard Work

 Results

  • Doubled production capacity without the addition of equipment or resources
  • Reduced product lead time by 80%
  • Reduced overtime from over 25% to under 5%
  • Increased productivity by 56%
  • Greatly improved On-Time Delivery – they now consistently meet customer delivery commitments

Download the PDF

 

Latest Insights

When one of our clients recognized the extent to which rising inefficiencies were affecting their business processes, the client reached out to the CBS experts for help. In just a matter of months, the results speak for themselves: a significant bump in all relevant KPIs, with several areas improving as much as 93%.

After years of cost cutting and loss of experienced “Tribal” manufacturing knowledge, a CBS aerospace client was not able to support increasing customer demand. Though they continued to make promises to return to on-time delivery, they continued to run 9 months delinquent to customer demand. Based on our prompt assessment of the situation, CBS developed and implemented an improvement plan that brought the client back to on-time and full condition.